Check whether your charger meets the requirements of the Recovery and Resilience Plan call
Article contents
This checklist is intended for existing beneficiaries of call 03I04-26-V05. It helps check project documents and operating settings. It is not an invitation to submit a new application or a substitute for contractual conditions.
What to prepare
- The contract, its annexes and valid amendments.
- Identification of supplied stations and technical sheets for the exact variants.
- The design and installation documents applicable to your project.
- Access to the MyAgeVolt space and contact details for the responsible operator.
What to check before commissioning
- Compare the supplied equipment and its placement with the approved design.
- Verify professional installation completion, electrical inspection and required documents.
- Check operator and station identification against project requirements.
- Verify prices, public access and any roaming policies under your contract.
- Test charging and agree a procedure for faults.
Official call documents
When assessing requirements, use the applicable documents for your call and contract. Seminar materials from April 2025 are supplementary explanations, not revised conditions.
- official IDRO information
- Ministry of Economy presentation — information seminar on the charging infrastructure support call (April 2025)
- Ministry of Economy call No. 03I04-26-V05 — support for building electric vehicle charging infrastructure (official call document)
Original reference image
These images come from the original article. Select parameters and interfaces for your specific device configuration using the guide above.