Check whether your charger meets the requirements of the Recovery and Resilience Plan call

Article contents

This checklist is intended for existing beneficiaries of call 03I04-26-V05. It helps check project documents and operating settings. It is not an invitation to submit a new application or a substitute for contractual conditions.

What to prepare

  • The contract, its annexes and valid amendments.
  • Identification of supplied stations and technical sheets for the exact variants.
  • The design and installation documents applicable to your project.
  • Access to the MyAgeVolt space and contact details for the responsible operator.

What to check before commissioning

  1. Compare the supplied equipment and its placement with the approved design.
  2. Verify professional installation completion, electrical inspection and required documents.
  3. Check operator and station identification against project requirements.
  4. Verify prices, public access and any roaming policies under your contract.
  5. Test charging and agree a procedure for faults.

Official call documents

When assessing requirements, use the applicable documents for your call and contract. Seminar materials from April 2025 are supplementary explanations, not revised conditions.

Original reference image

These images come from the original article. Select parameters and interfaces for your specific device configuration using the guide above.

Check whether your charger meets the requirements of the Recovery and Resilience Plan call — reference image 1

Related guides and solutions