A practical guide to electromobility for municipalities
Article contents
Municipal charging should be based on places where cars regularly park: near municipal offices, sports facilities, schools, services or housing. Company vehicles, residents and visitors need different arrangements.
Preparation process
- Identify users, expected parking times and the service's objective.
- Choose locations and check electrical capacity, access and cabling options.
- Design the number of spaces, station power and access rules.
- Prepare technical documents, a budget and the required design documentation.
- Agree operation, monitoring, settlement and servicing arrangements.
AC or DC?
Longer parking allows AC charging to be used. DC may be suitable for a short stop requiring faster replenishment. The decision must account for the supply connection, investment and expected usage.
You set the operating rules
Stations can serve municipal vehicles, selected users and the public. MyAgeVolt configures access, prices and overviews. Energy management coordinates charging with the site's other consumption.
Documents for design and procurement
Use the product sheet for the exact model and variant when preparing the technical specification. For approvals, procurement or financial support, follow the applicable conditions of the specific project. This general procedure does not represent an open funding call.
Original reference images
These images come from the original article. Select parameters and interfaces for your specific device configuration using the guide above.







